RE: Define all operations to design and build an embankment

Bert de Weerd, modified 2 Years ago.

Define all operations to design and build an embankment

Keen Forecaster Post: 1 Join Date: 9/19/19 Recent Posts
Currently, we use two fundamentally different methods of defining a geometry.
- in D-Stability, there is no link between the stages
- in the prototype of D-Settlement, an initial mesh must contain all future geometries
This is not consistent within a suite.

We hope to solve this by defining an initial geometry, and allow operations on the geometry through all construction phases.

In this second user meeting, we want to have a complete inventory of all operations needed on the initial geometry, for an entire project.

The question is, which operations do you need?
Some first suggestions:
- add a berm
- make an excavation
- ...

Note that you can change water pressures, state and load in other tabs, this issue is related to the geometry only
Jantien Doolaard, modified 2 Years ago.

RE: Define all operations to design and build an embankment

Keen Forecaster Post: 1 Join Date: 8/24/21 Recent Posts
Replace a material in case of C=PHI=0
Raymond van der Meij, modified 2 Years ago.

RE: Define all operations to design and build an embankment

Keen Forecaster Posts: 2 Join Date: 5/10/21 Recent Posts
Peter van Tol brought up an important operation during the user meeting.

Due to settlements, a layer can displace and deform.

Knowing this information can later on help us use the right yield stress at the bottom of a slip plane.
Martin Arends, modified 2 Years ago.

RE: Define all operations to design and build an embankment

Keen Forecaster Post: 1 Join Date: 9/7/21 Recent Posts
Operations we need in D-Settlement regarding geometry:
- installing a temporary elevation
- soil improvement / replacing an existing soillayer with a lightweight material