intro story D-Flow FM

 

D-Flow Flexible Mesh

D-Flow Flexible Mesh (D-Flow FM) is the new software engine for hydrodynamical simulations on unstructured grids in 1D-2D-3D. Together with the familiar curvilinear meshes from Delft3D 4, the unstructured grid can consist of triangles, pentagons (etc.) and 1D channel networks, all in one single mesh. It combines proven technology from the hydrodynamic engines of Delft3D 4 and SOBEK 2 and adds flexible administration, resulting in:

  • Easier 1D-2D-3D model coupling, intuitive setup of boundary conditions and meteorological forcings (amongst others).
  • More flexible 2D gridding in delta regions, river junctions, harbours, intertidal flats and more.
  • High performance by smart use of multicore architectures, and grid computing clusters.
An overview of the current developments can be found here.
 
The D-Flow FM - team would be delighted if you would participate in discussions on the generation of meshes, the specification of boundary conditions, the running of computations, and all kinds of other relevant topics. Feel free to share your smart questions and/or brilliant solutions! 

 

=======================================================
We have launched a new website (still under construction so expect continuous improvements) and a new forum dedicated to Delft3D Flexible Mesh.

Please follow this link to the new forum: 
/web/delft3dfm/forum

Post your questions, issues, suggestions, difficulties related to our Delft3D Flexible Mesh Suite on the new forum.

=======================================================

** PLEASE TAG YOUR POST! **

 

 

Sub groups
D-Flow Flexible Mesh
DELWAQ
Cohesive sediments & muddy systems

 


Message Boards

Things considered in Daily Scrum

YS
Yuvaraj singh, modified 24 Days ago.

Things considered in Daily Scrum

Jedi Knight Posts: 150 Join Date: 8/3/20 Recent Posts
Things considered in Daily ScrumBroadcastingOnce the Product Owner accepts the work done by the team, one of the team members who were there during the acceptance of the work can announce.
  • Work is done and accepted.
  • Where are we towards the Sprint goal?
BoardwalkWhen there is visibility about the progress is available for the team, then every team member knows what is expected out of them. They automatically work towards the team goal. The boardwalk is one of the ways to do Daily Scrum.In the boardwalk, one of the team members walks to the board and reads what happened since the last sync up.Pair UpdateIn Pair update, the developers update what they are working on and along with whom. In a PBI, more than one developer will work at a time and so one can collectively call out what is happening on that item. One person will update the progress on the item, which is in progress, along with the names of people who are working on it. <!--td {border: 1px solid #ccc;}br {mso-data-placement:same-cell;}-->Product Prototyping